Services

Oil Pipeline Cold Cutting

Within the scope of the renovation works of Shell’s 23-year old oil pipeline of 492 meters, located off Antalya – Konyaaltı, the old pipes would be taken ashore, cut and recycled. However, the classical flame cutting method could not be applied to pipes carrying hazardous materials such as oil pipes. Upon this, as BMC Marine, we got involved in this business with our cold cutting machine through Deep Offshore and we performed a successful work and we were able to cut half a kilometer of pipe in 6 days. Now we share our story of cutting with you.